← Back to map

Chiquito Grid, LLCPlanned

Riverside County, California · EIA plant ID 65655 · Operator: chiquito grid, llc
BatteryCAISOBA: CISO

80 MW planned (Batteries), first expected Mar 2027 · EIA-860M

Nameplate—MWSummer — MW
Generators0in service
Net generation—GWh12 mo
Capacity factor—not meaningful for storage
Heat rate—thermal plants only
First online—

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
HECHQBatteriesBA8080planned Mar 2027Planned—coming soon

Owner / operator

Operator: chiquito grid, llc. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
RCWD PV Project4 MW9.7 km
EMWD - Sun City RWRF2 MW12.7 km
Ortega Grid, LLC20 MW12.9 km
Lake Elsinore Canopies - Lakeside HS1 MW15 km
Menifee Power Bank680 MW18.8 km
Diamond Valley Lake30 MW20.1 km