SR Snipesville III
Jeff Davis County, Georgia · EIA plant ID 66171 · Operator: SR Snipesville III, LLC
Nameplate107MWSummer 107 MW
Generators1in service
Net generation245GWh12 mo to Aug 2026
Capacity factor26%solar units, summer MW
Heat rate—thermal plants only
First online2023
The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2023 | 62.6 | 13.3% | — |
| 2024 | 238 | 25.3% | — |
| 2025 | 255.5 | 27.3% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| SNIP3 | Solar Photovoltaic | PV | 107 | 107 | Jul 2023 | Operating | — | coming soon |
Owner / operator
Operator: SR Snipesville III, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| SR Snipesville III, LLC | 100.0% | 107 MW |
Nearby plants
Within 80 km.
| Snipesville | 86 MW | 2.5 km |
| SR Snipesville II | 107 MW | 4.8 km |
| Hazlehurst II | 53 MW | 20.5 km |
| Hazlehurst III | 40 MW | 21.5 km |
| SR Hazlehurst | 20 MW | 21.9 km |
| Blackwater Solar | 80 MW | 36.2 km |