← Back to map

Snipesville

Jeff Davis County, Georgia · EIA plant ID 62165 · Operator: SR Snipesville
SolarSolar PhotovoltaicBA: SOCO
Nameplate86MWSummer 86 MW
Generators1in service
Net generation177GWh12 mo to Aug 2026
Capacity factor23%solar units, summer MW
Heat rate—thermal plants only
First online2020

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
01020GWh202120222023202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%30%2020202120222023202420252026202723.5% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
202010.516.4%—
202121128.0%—
2022215.528.6%—
2023177.123.5%—
2024180.123.8%—
2025207.227.5%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
SNIPESolar PhotovoltaicPV8686Dec 2020Operating—coming soon

Owner / operator

Operator: SR Snipesville. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
SR Snipesville100.0%86 MW

Nearby plants

Within 80 km.
SR Snipesville III107 MW2.5 km
SR Snipesville II107 MW3.3 km
Hazlehurst II53 MW18.1 km
Hazlehurst III40 MW19 km
SR Hazlehurst20 MW19.6 km
Blackwater Solar80 MW37.7 km