← Back to map

Dover Solar and Battery Storage

Hillsborough County, Florida · EIA plant ID 66129 · Operator: Tampa Electric Co
SolarBatteriesSolar PhotovoltaicBA: TEC
Nameplate40MWSummer 40 MW
Generators2in service
Net generation47GWh12 mo to Aug 2026
Capacity factor22%solar units, summer MW
Heat rate—thermal plants only
First online2023

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0246GWh202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%2023202420252026202722.1% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2023210.5%—
202450.322.9%—
20254721.9%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1Solar PhotovoltaicPV2525Dec 2023Operating—coming soon
BESS1BatteriesBA1515Dec 2024Operating—coming soon

Owner / operator

Operator: Tampa Electric Co. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Tampa Electric Co100.0%40 MW

Nearby plants

Within 80 km.
English Creek Solar23 MW13.2 km
Laurel Oaks Solar61 MW13.5 km
Hillsborough County Resource Recovery47 MW13.7 km
Lakeland Electric Co. (FL)-Airport 12 MW15.6 km
Magnolia Solar75 MW15.6 km
Lakeland Electric Co. (FL) - Airport II4 MW15.6 km