CoGen Stryker Puerto Rico
Puerto Rico · EIA plant ID 66058 · Operator: Stryker Puerto Rico LLC
Nameplate2MWSummer 2 MW
Generators2in service
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online2026
Capacity factor by year
Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| 1 | Natural Gas Internal Combustion Engine | IC | 1 | 0.8 | Jan 2026 | Operating | — | coming soon |
| 2 | Natural Gas Internal Combustion Engine | IC | 1 | 0.8 | Jan 2026 | Operating | — | coming soon |
Owner / operator
Operator: Stryker Puerto Rico LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Stryker Puerto Rico LLC | 100.0% | 2 MW |
Nearby plants
Within 80 km.
| Patillas | 1 MW | 6.4 km |
| Jobos | 42 MW | 8.2 km |
| Pfizer Guayama | 8 MW | 9 km |
| PF Consumer Healthcare BV PR Operations | 2 MW | 9.3 km |
| AES Puerto Rico | 510 MW | 9.7 km |
| AES ILUMINA | 20 MW | 10.6 km |