← Back to map

AES ILUMINARetirement planned

Guayama County, Puerto Rico · EIA plant ID 61036 · Operator: AES ILUMINA, LLC
SolarSolar Photovoltaic
Nameplate20MWSummer 15 MW
Generators1in service
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online2012Retirement planned Nov 2042

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
ILUMISolar PhotovoltaicPV2015Nov 2012Operating · retirement plannedNov 2042coming soon

Owner / operator

Operator: AES ILUMINA, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
AES ILUMINA, LLC100.0%20 MW

Nearby plants

Within 80 km.
AES Puerto Rico510 MW0.9 km
PF Consumer Healthcare BV PR Operations2 MW2 km
Pfizer Guayama8 MW2.1 km
Jobos42 MW2.5 km
Horizon Energy (PR) Hybrid15 MW7.4 km
Aguirre Plant1,534 MW7.9 km