← Back to map

Jobos

Puerto Rico · EIA plant ID 61171 · Operator: puerto rico electric pwr auth
OilPetroleum Liquids
Nameplate42MWSummer 42 MW
Generators2in service
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online1973

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
GT-1Petroleum LiquidsGT2121Apr 1973Operating—coming soon
GT-2Petroleum LiquidsGT2121Apr 1973Operating—coming soon

Owner / operator

Operator: puerto rico electric pwr auth. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
puerto rico electric pwr auth100.0%42 MW

Nearby plants

Within 80 km.
Pfizer Guayama8 MW0.9 km
PF Consumer Healthcare BV PR Operations2 MW1.2 km
AES Puerto Rico510 MW1.8 km
AES ILUMINA20 MW2.5 km
CoGen Stryker Puerto Rico2 MW8.2 km
Horizon Energy (PR) Hybrid15 MW8.8 km