← Back to map

Niagara Bottling - Rialto

San Bernardino County, California · EIA plant ID 65652 · Operator: SkyHigh 2 Solar
SolarSolar PhotovoltaicCAISOBA: CISO
Nameplate4MWSummer 4 MW
Generators1in service
Net generation8GWh12 mo to Dec 2025
Capacity factor21%solar units, summer MW
Heat rate—thermal plants only
First online2021

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0200400600800MWh2022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%20212022202320242025202621.3% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
202100.0%—
20228.623.4%—
20237.921.5%—
20247.620.5%—
20257.821.3%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
NBRIASolar PhotovoltaicPV4.24.2Dec 2021Operating—coming soon

Owner / operator

Operator: SkyHigh 2 Solar. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
SkyHigh 2 Solar100.0%4 MW

Nearby plants

Within 80 km.
Solar Photovoltaic Project #26retired0.9 km
Chambers 4 - Rialto LGB82 MW1.2 km
Inland Empire Energy Storage70 MW1.3 km
Fontana3 MW3.8 km
Solar Photovoltaic Project #03retired3.9 km
IOS II-LAX94 MW5 km