Solar Photovoltaic Project #03Retired

San Bernardino County, California · EIA plant ID 57217 · Operator: Southern California Edison Co
SolarCAISOBA: CISO

×1 MW solar retired since 2020 (latest Dec 2023)

Nameplate—MWSummer — MW
Generators0in service
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online—

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
-50050100150200MWh2011201220132014201520162017201820192020202120222023

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%5%10%15%2012201420162018202020222024

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20111.317.6%—
20120.99.7%—
2013-0.1-1.3%—
20140.44.3%—
20151.314.3%—
20161.213.2%—
20171.113.1%—
20181.112.4%—
20190.910.8%—
20200.66.5%—
20210.55.4%—
20220.77.6%—
2023-0-0.2%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
S003ASolar PhotovoltaicPV0.50.5Mar 2011Retired Dec 2023—coming soon
S003BSolar PhotovoltaicPV0.50.5Mar 2011Retired Dec 2023—coming soon

Owner / operator

Operator: Southern California Edison Co. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
Niagara Bottling - Rialto4 MW3.9 km
Chambers 4 - Rialto LGB82 MW3.9 km
Rialto - High School1 MW4.1 km
IOS II-LAX94 MW4.6 km
Solar Photovoltaic Project #26retired4.7 km
CA Bloomington 2551 S Lilac Avenue Micro—4.8 km