Ridgely Energy Farm

Lake County, Tennessee · EIA plant ID 65445 · Operator: Leeward Asset Management, LLC
SolarSolar PhotovoltaicBA: TVA

50 MW planned (Batteries), first expected Dec 2029 · EIA-860M

Nameplate177MWSummer 177 MW
Generators1in service
Net generation401GWh12 mo to Aug 2026
Capacity factor26%solar units, summer MW
Heat rate—thermal plants only
First online2025

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
010203040GWh2026

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%20252026202725.9% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2025152.423.4%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
RIGPVSolar PhotovoltaicPV177177Aug 2025Operating—coming soon
RBESSBatteriesBA5050planned Dec 2029Planned—coming soon

Owner / operator

Operator: Leeward Asset Management, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Leeward Asset Management, LLC100.0%177 MW

Nearby plants

Within 80 km.
New Madrid1,300 MW24.8 km
New Madrid Solar, LLC200 MW26.6 km
OETN1100 MW43 km
Crooked Lake Solar, LLC175 MW52.3 km
Malden16 MW53 km
Kennett31 MW53.5 km