New Madrid Solar, LLC

New Madrid County, Missouri · EIA plant ID 69166 · Operator: New Madrid Solar, LLC
SolarSolar PhotovoltaicMISOBA: MISO
Nameplate200MWSummer 162 MW
Generators1in service
Net generation404GWh12 mo to Aug 2026
Capacity factor34%solar units, summer MW
Heat rate—thermal plants only
First online2025

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
02040GWh2026

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%30%20252026202734.2% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
202553.922.8%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
3603Solar PhotovoltaicPV200162Nov 2025Operating—coming soon

Owner / operator

Operator: New Madrid Solar, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
New Madrid Solar, LLC100.0%200 MW

Nearby plants

Within 80 km.
New Madrid1,300 MW6.8 km
Ridgely Energy Farm177 MW26.6 km
Malden16 MW30.3 km
Sikeston Power Station261 MW42.1 km
Essex121 MW44.8 km
Kennett31 MW47.6 km