← Back to map

Blackwater River Solar Energy Center

Santa Rosa County, Florida · EIA plant ID 65433 · Operator: Florida Power & Light Co
SolarBatteriesSolar PhotovoltaicBA: FPL
Nameplate149MWSummer 149 MW
Generators2in service
Net generation137GWh12 mo to Aug 2026
Capacity factor22%solar units, summer MW
Heat rate—thermal plants only
First online2023

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
051015GWh2023202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%2023202420252026202721.8% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2023113.817.4%—
2024142.221.7%—
2025141.221.6%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1Solar PhotovoltaicPV74.574.5Jan 2023Operating—coming soon
2BatteriesBA74.574.5Dec 2025Operating—coming soon

Owner / operator

Operator: Florida Power & Light Co. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Florida Power & Light Co100.0%149 MW

Nearby plants

Within 80 km.
Big Juniper Solar75 MW1.5 km
Canoe149 MW15.5 km
Santa Rosa Energy Center275 MW19.1 km
Pea Ridge14 MW19.8 km
Gulf Coast Solar Center II40 MW24.4 km
Crist2,108 MW28.8 km