← Back to map

Crist

Escambia County, Florida · EIA plant ID 641 · Operator: Florida Power & Light Co
Natural gasNatural Gas Fired Combustion TurbineNatural Gas Steam TurbineBA: FPL
Nameplate2,108MWSummer 1,858 MW
Generators8in service
Net generation1,845GWh12 mo to Aug 2026
Capacity factor11%gas/coal/oil units, summer MW
Heat rate11,478Btu/kWhfossil units, electric fuel, HHV
First online1959Runs as peaking

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
-2000200400600GWh2001200320052007200920112013201520172019202120232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%25%50%75%2005201020152020202511.3% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
10,00011,00012,0002005201020152020202511,478 Btu/kWh · 12 mo
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20014,488.2——
20024,572.2——
20036,413.273.2%10,355
20045,458.262.4%10,453
20055,008.257.4%10,683
20066,279.275.5%10,553
20076,358.578.0%10,741
20085,216.163.8%10,815
20093,308.240.6%11,170
20104,834.560.9%10,973
20113,918.349.4%11,116
20122,770.734.1%11,314
20132,807.134.7%11,000
20143,469.342.9%10,825
20152,476.430.6%11,073
20162,63332.4%11,238
20173,122.438.6%10,987
20183,257.540.2%10,863
20192,66833.0%10,634
20201,099.813.6%12,215
20211,556.917.7%12,223
20221,474.19.1%12,274
20232,255.513.9%12,293
20242,800.617.2%11,439
20252,035.712.5%11,345

Fuel capability

Gas-fired turbines (CT/GT/CA/CS) that can also burn liquid fuel. EIA-860 Schedule 3 for capability, EIA-923 for actual burn.
StatusListed in EIA-860, no liquid burn in 36 months
Liquid fuel burned · 36 mo0 MMBtu
Last month with liquid burn—
Switch while operatingYes
Net summer MW on gas942
Net summer MW on oil876
Time gas → oilup to 1 h (EIA 1H)
Time oil → gasup to 1 h (EIA 1H)

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
4Natural Gas Steam TurbineST93.775Jul 1959Operating—coming soon
5Natural Gas Steam TurbineST93.775Jun 1961Operating—coming soon
6Natural Gas Steam TurbineST369.7299May 1970Operating—coming soon
7Natural Gas Steam TurbineST578475Aug 1973Operating—coming soon
8ANatural Gas Fired Combustion TurbineGT243.1236Dec 2021Operating—coming soon
8BNatural Gas Fired Combustion TurbineGT243.1236Dec 2021Operating—coming soon
8CNatural Gas Fired Combustion TurbineGT243.1231.1Dec 2021Operating—coming soon
8DNatural Gas Fired Combustion TurbineGT243.1231.1Dec 2021Operating—coming soon
1Natural Gas Steam TurbineST28.124Jan 1945Retired Mar 2003—coming soon
2Natural Gas Steam TurbineST28.124Jun 1949Retired May 2006—coming soon
3Natural Gas Steam TurbineST37.535Sep 1952Retired May 2006—coming soon

Owner / operator

Operator: Florida Power & Light Co. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Florida Power & Light Co100.0%2,108 MW

Nearby plants

Within 80 km.
Pensacola Florida Plant102 MW4.3 km
Pea Ridge14 MW9 km
International Paper Pensacola83 MW10.3 km
Standby Generation Plant14 MW10.3 km
Santa Rosa Energy Center275 MW10.5 km
Gulf Coast Solar Center III50 MW15 km