Gulf Coast Solar Center III

Escambia County, Florida · EIA plant ID 59691 · Operator: CD Arevon USA, Inc.
SolarSolar PhotovoltaicBA: SOCO
Nameplate50MWSummer 50 MW
Generators1in service
Net generation98GWh12 mo to Aug 2026
Capacity factor22%solar units, summer MW
Heat rate—thermal plants only
First online2017

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
02.557.510GWh201820192020202120222023202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%2018202020222024202622.4% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
201713.718.7%—
201893.221.3%—
201994.721.6%—
202091.420.8%—
202190.320.6%—
202287.820.0%—
202383.719.1%—
202491.120.8%—
202593.221.3%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
GCSC3Solar PhotovoltaicPV5050Nov 2017Operating—coming soon

Owner / operator

Operator: CD Arevon USA, Inc.. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
CD Arevon USA, Inc.100.0%50 MW

Nearby plants

Within 80 km.
Standby Generation Plant14 MW9.5 km
Perdido3 MW12.3 km
International Paper Pensacola83 MW14.1 km
Crist2,108 MW15 km
Pensacola Florida Plant102 MW16 km
Pea Ridge14 MW23.4 km