Gilead Foster City Solar Project

San Mateo County, California · EIA plant ID 65409 · Operator: gilead sciences inc. foster city
SolarBatteriesSolar PhotovoltaicCAISOBA: CISO
Nameplate2MWSummer 2 MW
Generators3in service
Net generation2GWh12 mo to Dec 2025
Capacity factor22%solar units, summer MW
Heat rate—thermal plants only
First online2021

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0100200MWh2022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%20212022202320242025202622.0% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20211.421.3%—
20221.921.2%—
20231.517.3%—
20241.922.5%—
20251.922.0%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
GFCS1Solar PhotovoltaicPV0.90.9Apr 2021Operating—coming soon
GFCS2Solar PhotovoltaicPV0.20.1Apr 2021Operating—coming soon
GFCSBBatteriesBA0.50.5Apr 2021Operating—coming soon

Owner / operator

Operator: gilead sciences inc. foster city. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
gilead sciences inc. foster city100.0%2 MW

Nearby plants

Within 80 km.
Franklin Templeton San Mateo1 MW3.2 km
Silicon Valley Clean Water2 MW5 km
AT&T - Redwood City1 MW11.9 km
Ameresco Ox Mountain11 MW13.2 km
City of Hayward WWTP3 MW14.2 km
Shelter Creek Condominiums Solar2 MW14.4 km