AT&T - Redwood City
San Mateo County, California · EIA plant ID 65204 · Operator: Bloom Energy
Nameplate1MWSummer 1 MW
Generators1in service
Net generation3GWh12 mo to Dec 2025
Capacity factor32%gas/coal/oil units, summer MW
Heat rate8,049Btu/kWhfossil units, electric fuel, HHV
First online2013Runs as baseload
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2021 | 6.7 | 76.0% | 7,464 |
| 2022 | 6.1 | 69.3% | 7,802 |
| 2023 | 7 | 79.5% | 7,236 |
| 2024 | 5.6 | 64.1% | 7,471 |
| 2025 | 2.8 | 32.0% | 8,049 |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| ATT95 | Other Natural Gas | FC | 1 | 1 | Mar 2013 | Operating | — | coming soon |
Owner / operator
Operator: Bloom Energy. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Bloom Energy | 100.0% | 1 MW |
Nearby plants
Within 80 km.
| SRI International Cogen Project | 6 MW | 3.7 km |
| Stanford Campus Solar | 4 MW | 6.2 km |
| Silicon Valley Clean Water | 2 MW | 7.4 km |
| Solar Star Palo Alto I, LLC | 1 MW | 9 km |
| City of Palo Alto | retired | 9.3 km |
| Franklin Templeton San Mateo | 1 MW | 10.7 km |