Shelter Creek Condominiums Solar

San Mateo County, California · EIA plant ID 62806 · Operator: Vista Solar, Inc.
SolarSolar PhotovoltaicCAISOBA: CISO
Nameplate2MWSummer 2 MW
Generators1in service
Net generation3GWh12 mo to Dec 2025
Capacity factor16%solar units, summer MW
Heat rate—thermal plants only
First online2020

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0100200300400MWh20212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%5%10%15%202020212022202320242025202616.4% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20202.915.2%—
20213.717.5%—
20223.617.2%—
20233.416.1%—
20243.516.7%—
20253.416.4%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
SCC01Solar PhotovoltaicPV1.92.4Feb 2020Operating—coming soon

Owner / operator

Operator: Vista Solar, Inc.. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
SCP 7, LLP100.0%2 MW

Nearby plants

Within 80 km.
Google Bayhill Solar PV and Microgrid4 MW0.9 km
SF State Universityretired12.4 km
Ameresco Ox Mountain11 MW13.5 km
SF Southeast Cogen Plant2 MW13.8 km
Gilead Foster City Solar Project2 MW14.4 km
Franklin Templeton San Mateo1 MW14.7 km