Nestlewood Solar

Clermont County, Ohio · EIA plant ID 65215 · Operator: Nestlewood Solar
SolarSolar PhotovoltaicPJMBA: PJM
Nameplate80MWSummer 80 MW
Generators1in service
Net generation163GWh12 mo to Aug 2026
Capacity factor23%solar units, summer MW
Heat rate—thermal plants only
First online2023

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
05101520GWh202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%2023202420252026202723.2% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20231.42.3%—
2024140.220.0%—
2025157.222.4%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
NSTLWSolar PhotovoltaicPV8080Dec 2023Operating—coming soon

Owner / operator

Operator: Nestlewood Solar. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Nestlewood Solar100.0%80 MW

Nearby plants

Within 80 km.
Brown County LFGTE Power Station5 MW10.5 km
Hillcrest Solar200 MW19.4 km
W H Zimmerretired19.4 km
Meldahl Hydroelectric Project105 MW20.1 km
New Market Solar100 MW25.1 km
Hecate Energy Highland LLC300 MW25.1 km