Foothill Sanitary Landfill - Solar Array

San Joaquin County, California · EIA plant ID 65089 · Operator: ameresco san joaquin solar llc
SolarSolar PhotovoltaicBA: PACW
Nameplate4MWSummer 4 MW
Generators1in service
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online2021

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
00.250.50.751GWh20212022

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%30%202120222023

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20219.430.8%—
20228.226.6%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
5452Solar PhotovoltaicPV3.63.5Jan 2021Operating—coming soon

Owner / operator

Operator: ameresco san joaquin solar llc. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
ameresco san joaquin solar llc100.0%4 MW

Nearby plants

Within 80 km.
Ameresco San Joaquin4 MW1.4 km
North Central Valley132 MW8 km
New Hogan Power Plant3 MW15.8 km
Kettleman Solar Project1 MW20.2 km
Woodward Power Plant3 MW20.8 km
Robert O Schulz Solar Farm2 MW20.8 km