← Back to map

Kettleman Solar Project

San Joaquin County, California · EIA plant ID 58510 · Operator: Ecos Energy LLC
SolarSolar PhotovoltaicCAISOBA: CISO
Nameplate1MWSummer 1 MW
Generators1in service
Net generation3GWh12 mo to Dec 2025
Capacity factor29%solar units, summer MW
Heat rate—thermal plants only
First online2014

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0100200300MWh20152016201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%30%201420162018202020222024202628.6% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20142.233.3%—
20152.629.8%—
20162.528.6%—
20172.326.2%—
20182.225.5%—
20192.630.1%—
20202.629.1%—
20212.629.8%—
20222.832.2%—
20232.730.8%—
20242.630.1%—
20252.528.6%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
PV5Solar PhotovoltaicPV11Apr 2014Operating—coming soon

Owner / operator

Operator: Ecos Energy LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Ecos Energy LLC100.0%1 MW

Nearby plants

Within 80 km.
Bear Creek Solar2 MW1.8 km
Enchanted Rock Lodi48 MW14.2 km
Lodi27 MW14.2 km
Camanche11 MW15.5 km
North Central Valley132 MW16 km
SMUD at Van Conett3 MW19 km