Turkey Creek Solar ProjectUnder construction

Pueblo County, Colorado · EIA plant ID 64744 · Operator: 174 Power Global Corp.
SolarBA: WACM

200 MW under construction (Solar Photovoltaic), first expected Feb 2027 · EIA-860M

Nameplate—MWSummer — MW
Generators0in service · 200 MW building
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online—

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
TC001Solar PhotovoltaicPV200200planned Feb 2027Under construction—coming soon

Owner / operator

Operator: 174 Power Global Corp.. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
James W. Broderick Hydropower Plant8 MW21 km
Fremont CO 1, LLC2 MW27.6 km
Fountain Valley Power Facility228 MW27.7 km
CSU Pueblo1 MW30.3 km
Clear Spring Ranch PV Project10 MW31 km
Front Range Power Plant554 MW32.8 km