Ranchland Wind Project I

Callahan County, Texas · EIA plant ID 64551 · Operator: Ranchland Wind Project I, LLC
WindOnshore Wind TurbineERCOTBA: ERCO
Nameplate115MWSummer 115 MW
Generators1in service
Net generation455GWh12 mo to Aug 2026
Capacity factor45%wind units, summer MW
Heat rate—thermal plants only
First online2024

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
02040GWh2023202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), wind units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%20%40%202420252026202745.2% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2022236.6——
2023395.5——
2024405.453.5%—
2025437.243.4%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
WT2Onshore Wind TurbineWT114.9114.9Apr 2024Operating—vestas V150-4.2

Owner / operator

Operator: Ranchland Wind Project I, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Ranchland Wind Project I, LLC100.0%115 MW

Nearby plants

Within 80 km.
Ranchland Wind Project II148 MW3 km
Ranchland Wind Storage73 MW3.1 km
Enbridge Solar (Sequoia II)—5.1 km
BMP Wind (TX)340 MW9 km
Longhorn Storage165 MW14.7 km
Century Oak Wind Project, LLC152 MW14.7 km