Ranchland Wind Project I
Callahan County, Texas · EIA plant ID 64551 · Operator: Ranchland Wind Project I, LLC
Nameplate115MWSummer 115 MW
Generators1in service
Net generation455GWh12 mo to Aug 2026
Capacity factor45%wind units, summer MW
Heat rate—thermal plants only
First online2024
The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), wind units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2022 | 236.6 | — | — |
| 2023 | 395.5 | — | — |
| 2024 | 405.4 | 53.5% | — |
| 2025 | 437.2 | 43.4% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| WT2 | Onshore Wind Turbine | WT | 114.9 | 114.9 | Apr 2024 | Operating | — | vestas V150-4.2 |
Owner / operator
Operator: Ranchland Wind Project I, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Ranchland Wind Project I, LLC | 100.0% | 115 MW |
Nearby plants
Within 80 km.
| Ranchland Wind Project II | 148 MW | 3 km |
| Ranchland Wind Storage | 73 MW | 3.1 km |
| Enbridge Solar (Sequoia II) | — | 5.1 km |
| BMP Wind (TX) | 340 MW | 9 km |
| Longhorn Storage | 165 MW | 14.7 km |
| Century Oak Wind Project, LLC | 152 MW | 14.7 km |