← Back to map

BMP Wind (TX)

Callahan County, Texas · EIA plant ID 62809 · Operator: BMP Wind LLC
WindOnshore Wind TurbineERCOTBA: ERCO
Nameplate340MWSummer 340 MW
Generators1in service
Net generation999GWh12 mo to Aug 2026
Capacity factor34%wind units, summer MW
Heat rate—thermal plants only
First online2021

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
050100GWh20222023202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), wind units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%30%202120222023202420252026202733.5% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
202166.630.5%—
2022719.628.0%—
2023780.830.4%—
2024690.223.1%—
2025870.429.2%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
BMPOnshore Wind TurbineWT340340Dec 2021Operating—siemens gamesa SG 4.5-145

Owner / operator

Operator: BMP Wind LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
BMP Wind LLC100.0%340 MW

Nearby plants

Within 80 km.
Ranchland Wind Project I115 MW9 km
Ranchland Wind Project II148 MW12 km
Ranchland Wind Storage73 MW12 km
Enbridge Solar (Sequoia II)—12.5 km
Century Oak Wind Project, LLC152 MW19.9 km
Longhorn Storage165 MW19.9 km