← Back to map

Ranchland Wind Project II

Callahan County, Texas · EIA plant ID 64544 · Operator: Ranchland Wind Project II, LLC
WindOnshore Wind TurbineERCOTBA: ERCO
Nameplate148MWSummer 148 MW
Generators1in service
Net generation529GWh12 mo to Aug 2026
Capacity factor41%wind units, summer MW
Heat rate—thermal plants only
First online2024

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0204060GWh2023202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), wind units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%20%40%202420252026202740.8% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2022281.7——
2023469.9——
202449750.9%—
2025500.138.6%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
WT2Onshore Wind TurbineWT148148Apr 2024Operating—vestas V162-5.6

Owner / operator

Operator: Ranchland Wind Project II, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Ranchland Wind Project II, LLC100.0%148 MW

Nearby plants

Within 80 km.
Ranchland Wind Storage73 MW0 km
Ranchland Wind Project I115 MW3 km
Enbridge Solar (Sequoia II)—4.6 km
BMP Wind (TX)340 MW12 km
Roadrunner Crossing Energy Storage150 MW13.8 km
Century Oak Wind Project, LLC152 MW14.3 km