Nameplate662MWSummer 692 MW
Generators4in service
Net generation3,748GWh12 mo to Aug 2026
Capacity factor62%gas/coal/oil units, summer MW
Heat rate7,114Btu/kWhfossil units, electric fuel, HHV
First online1971Runs as baseload
The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2001 | 2,316.4 | — | — |
| 2002 | 4,022.4 | — | — |
| 2003 | 3,709.9 | 49.0% | 8,830 |
| 2004 | 4,904.1 | 64.6% | 8,835 |
| 2005 | 4,422.4 | 58.4% | 8,967 |
| 2006 | 4,706.1 | 61.8% | 9,007 |
| 2007 | 4,696.1 | 61.6% | 8,899 |
| 2008 | 4,739.9 | 62.0% | 8,794 |
| 2009 | 5,182.9 | 68.0% | 8,053 |
| 2010 | 4,666.3 | 61.2% | 8,507 |
| 2011 | 5,028.4 | 66.0% | 8,004 |
| 2012 | 4,649.7 | 60.8% | 7,819 |
| 2013 | 4,360.1 | 57.2% | 8,010 |
| 2014 | 4,506.3 | 59.1% | 8,145 |
| 2015 | 4,017.4 | 52.7% | 7,701 |
| 2016 | 3,507.8 | 67.4% | 7,333 |
| 2017 | 4,139.1 | 88.5% | 7,130 |
| 2018 | 4,032.5 | 86.2% | 7,124 |
| 2019 | 3,913.4 | 82.3% | 7,027 |
| 2020 | 4,967.6 | 104.2% | 7,078 |
| 2021 | 4,708.4 | 77.7% | 6,993 |
| 2022 | 4,542 | 74.9% | 7,026 |
| 2023 | 4,184.5 | 69.0% | 6,983 |
| 2024 | 3,965.1 | 65.2% | 7,053 |
| 2025 | 3,747.7 | 61.8% | 7,087 |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| 3A | Natural Gas Fired Combined Cycle | CT | 203.2 | — | Apr 2002 | Operating | — | coming soon |
| 3B | Natural Gas Fired Combined Cycle | CT | 203.2 | — | Apr 2002 | Operating | — | coming soon |
| 3S | Natural Gas Fired Combined Cycle | CA | 213.3 | 660 | Apr 2002 | Operating | — | coming soon |
| CT1 | Petroleum Liquids | GT | 41.8 | 32 | May 1971 | Operating | — | coming soon |
| 3C | — | CA | 180 | — | Apr 2002 | not_current | — | coming soon |
| 1 | Conventional Steam Coal | ST | 149.6 | 162 | Jun 1965 | Retired Mar 2016 | — | coming soon |
| 2 | Conventional Steam Coal | ST | 190.4 | 195 | Jun 1967 | Retired Mar 2016 | — | coming soon |
Owner / operator
Operator: Florida Power & Light Co. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Florida Power & Light Co | 100.0% | 662 MW |
Nearby plants
Within 80 km.
| WestRock Panama City Mill | retired | 16 km |
| Bay County Waste to Energy | retired | 17.3 km |
| Bay Ranch Solar Power Plant | 75 MW | 23.1 km |
| FPL Saw Palmetto Solar Energy Center | 75 MW | 30 km |
| FPL Cypress Pond Solar | 75 MW | 30.1 km |
| Sandy Creek Solar Power Plant | 75 MW | 33.4 km |