← Back to map

Bay County Waste to EnergyRetired

Bay County, Florida · EIA plant ID 10250 · Operator: Bay County Board-County Comm
OtherBA: SOCO

×14 MW other retired since 2020 (latest Jan 2021)

Nameplate—MWSummer — MW
Generators0in service
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—Btu/kWhfossil units, electric fuel, HHV
First online—

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
02468GWh20012003200520072009201120132015201720192021

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%50%100%2005201020152020

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
10,00015,00020,00025,000201020122014201620182020
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
200190.2103.0%—
200279.290.4%—
200376.387.1%—
200474.184.4%—
200569.379.1%—
20066877.6%—
200751.958.6%—
200811.813.4%—
200941.445.9%—
201059.165.3%27,135
20116465.1%13,426
201222.0%—
201342.747.7%—
201440.245.9%—
201554.762.4%23,185
201657.465.1%23,356
201762.670.3%23,375
20184548.7%26,443
201932.234.5%25,694
202050.556.8%21,902
20210.9——

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
GEN1Municipal Solid WasteST13.610Mar 1987Retired Jan 2021—coming soon

Owner / operator

Operator: Bay County Board-County Comm. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
Bay Ranch Solar Power Plant75 MW11.6 km
WestRock Panama City Millretired16.8 km
Lansing Smith662 MW17.3 km
FPL Saw Palmetto Solar Energy Center75 MW18.7 km
FPL Cypress Pond Solar75 MW18.9 km
Mule Creek Renewable Energy Center75 MW21 km