← Back to map

Lemolo 2

Douglas County, Oregon · EIA plant ID 6421 · Operator: PacifiCorp
HydroConventional HydroelectricBA: PACW
Nameplate44MWSummer 39 MW
Generators1in service
Net generation150GWh12 mo to Dec 2025
Capacity factor44%hydro units, summer MW
Heat rate—thermal plants only
First online1956

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
-505101520GWh2001200320052007200920112013201520172019202120232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), hydro units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%20%40%60%2005201020152020202544.3% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2001125.542.1%—
2002140.847.3%—
2003145.548.9%—
2004159.553.4%—
2005130.743.9%—
2006167.356.2%—
2007148.749.9%—
2008153.251.3%—
200989.630.1%—
2010138.546.5%—
201118361.4%—
201220762.0%—
201315045.1%—
2014173.751.5%—
2015136.640.5%—
2016146.743.4%—
2017200.959.6%—
201813339.5%—
2019143.542.5%—
202095.428.2%—
2021101.330.0%—
2022108.632.2%—
2023118.535.1%—
202462.718.5%—
2025149.544.3%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1Conventional HydroelectricHY43.738.5Nov 1956Operating—coming soon

Owner / operator

Operator: PacifiCorp. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
PacifiCorp100.0%44 MW

Nearby plants

Within 80 km.
Clearwater 226 MW1.6 km
Toketee Falls43 MW3.7 km
Fish Creek11 MW3.8 km
Slide Creek18 MW5.9 km
Clearwater 115 MW6.2 km