Clearwater 2

Douglas County, Oregon · EIA plant ID 3021 · Operator: PacifiCorp
HydroConventional HydroelectricBA: PACW
Nameplate26MWSummer 31 MW
Generators1in service
Net generation30GWh12 mo to Dec 2025
Capacity factor11%hydro units, summer MW
Heat rate—thermal plants only
First online1953

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
-202468GWh2001200320052007200920112013201520172019202120232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), hydro units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%2005201020152020202511.2% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
200139.817.5%—
200246.720.5%—
200350.222.0%—
200451.822.7%—
20054419.3%—
200641.418.2%—
200745.316.7%—
200843.415.9%—
20094215.5%—
201029.710.9%—
201156.320.7%—
201254.219.9%—
201339.414.5%—
201444.916.5%—
201532.111.8%—
201645.416.7%—
201767.724.9%—
201836.913.6%—
201935.813.2%—
202022.28.2%—
202115.45.7%—
202219.97.3%—
202326.39.7%—
202434.712.7%—
202530.511.2%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1Conventional HydroelectricHY2631Nov 1953Operating—coming soon

Owner / operator

Operator: PacifiCorp. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
PacifiCorp100.0%26 MW

Nearby plants

Within 80 km.
Lemolo 244 MW1.6 km
Toketee Falls43 MW3.1 km
Fish Creek11 MW3.3 km
Slide Creek18 MW5.9 km
Clearwater 115 MW6.1 km
Soda Springs11 MW8.6 km