Toketee Falls
Douglas County, Oregon · EIA plant ID 3040 · Operator: PacifiCorp
Nameplate43MWSummer 45 MW
Generators3in service
Net generation208GWh12 mo to Dec 2025
Capacity factor53%hydro units, summer MW
Heat rate—thermal plants only
First online1949
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), hydro units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2001 | 173.5 | 44.0% | — |
| 2002 | 205.1 | 52.0% | — |
| 2003 | 206.7 | 52.4% | — |
| 2004 | 211 | 53.4% | — |
| 2005 | 176.5 | 44.8% | — |
| 2006 | 234.8 | 59.6% | — |
| 2007 | 209.1 | 53.0% | — |
| 2008 | 218.9 | 55.4% | — |
| 2009 | 213 | 54.0% | — |
| 2010 | 189 | 47.9% | — |
| 2011 | 263.8 | 66.9% | — |
| 2012 | 263.8 | 66.7% | — |
| 2013 | 195.9 | 49.7% | — |
| 2014 | 226.4 | 57.4% | — |
| 2015 | 184 | 46.7% | — |
| 2016 | 232.8 | 58.9% | — |
| 2017 | 255.2 | 64.8% | — |
| 2018 | 195.1 | 49.5% | — |
| 2019 | 193.4 | 49.0% | — |
| 2020 | 156.6 | 39.6% | — |
| 2021 | 144.2 | 36.6% | — |
| 2022 | 183.3 | 46.5% | — |
| 2023 | 166.5 | 42.2% | — |
| 2024 | 184.1 | 46.6% | — |
| 2025 | 208.4 | 52.9% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| 1 | Conventional Hydroelectric | HY | 14.2 | 15 | Feb 1950 | Operating | — | coming soon |
| 2 | Conventional Hydroelectric | HY | 14.2 | 15 | Dec 1949 | Operating | — | coming soon |
| 3 | Conventional Hydroelectric | HY | 14.2 | 15 | Mar 1950 | Operating | — | coming soon |
Owner / operator
Operator: PacifiCorp. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| PacifiCorp | 100.0% | 43 MW |
Nearby plants
Within 80 km.
| Fish Creek | 11 MW | 0.2 km |
| Clearwater 2 | 26 MW | 3.1 km |
| Slide Creek | 18 MW | 3.1 km |
| Lemolo 2 | 44 MW | 3.7 km |
| Soda Springs | 11 MW | 5.7 km |
| Clearwater 1 | 15 MW | 9.2 km |