← Back to map

Golden Field Solar III, LLC

Kern County, California · EIA plant ID 63859 · Operator: Golden Field Solar III, LLC
SolarBatteriesSolar PhotovoltaicCAISOBA: CISO
Nameplate339MWSummer 339 MW
Generators2in service
Net generation527GWh12 mo to Aug 2026
Capacity factor33%solar units, summer MW
Heat rate—thermal plants only
First online2020

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0204060GWh202120222023202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%30%2020202120222023202420252026202732.6% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
202000.0%—
2021577.434.3%—
202258534.8%—
2023516.130.7%—
2024538.532.3%—
2025520.932.6%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
RCBABatteriesBA147147Mar 2024Operating—coming soon
RCTRSolar PhotovoltaicPV192192Dec 2020Operating—coming soon

Owner / operator

Operator: Golden Field Solar III, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Golden Field Solar III, LLC100.0%339 MW

Nearby plants

Within 80 km.
Solar Star California, XLI, LLC54 MW1.2 km
Golden Fields Solar I, LLC54 MW1.2 km
Rosamond South 1257 MW1.6 km
North Rosamond Solar LLC151 MW2.2 km
Solar Star 1318 MW3.3 km
Rosamond South II—3.4 km