North Rosamond Solar LLC

Kern County, California · EIA plant ID 59879 · Operator: North Rosamond Solar, LLC
SolarSolar PhotovoltaicCAISOBA: CISO
Nameplate151MWSummer 151 MW
Generators1in service
Net generation347GWh12 mo to Aug 2026
Capacity factor26%solar units, summer MW
Heat rate—thermal plants only
First online2019

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
010203040GWh2020202120222023202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%30%20192020202120222023202420252026202726.2% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2019234.230.2%—
2020354.226.7%—
2021349.926.4%—
2022325.624.6%—
2023339.825.7%—
2024392.729.6%—
2025397.230.0%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
GEN01Solar PhotovoltaicPV151.1151.1Jun 2019Operating—coming soon

Owner / operator

Operator: North Rosamond Solar, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
North Rosamond Solar, LLC100.0%151 MW

Nearby plants

Within 80 km.
Golden Field Solar III, LLC339 MW2.2 km
Rosamond South 1257 MW2.2 km
Golden Fields Solar I, LLC54 MW2.6 km
Solar Star California, XLI, LLC54 MW2.6 km
Solar Star 2279 MW2.9 km
Valentine Solar, LLC111 MW4.7 km