← Back to map

Cherry

Kings County, California · EIA plant ID 63850 · Operator: Westlands Cherry, LLC
BatteryBatteriesCAISOBA: CISO

360 MW planned (Batteries, Solar Photovoltaic), first expected Jul 2027 · EIA-860M

Nameplate40MWSummer 40 MW
Generators1in service
Net generation-2GWh12 mo to Aug 2026
Capacity factor—not meaningful for storage
Heat rate—thermal plants only
First online2026

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
-800-600-400-2000MWh

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
BESS1BatteriesBA4040May 2026Operating—coming soon
BESS2BatteriesBA110110planned Jul 2027Planned—coming soon
CHERYSolar PhotovoltaicPV249.7249.7planned Jul 2027Planned—coming soon

Owner / operator

Operator: Westlands Cherry, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Westlands Cherry, LLC100.0%40 MW

Nearby plants

Within 80 km.
Grape—3.1 km
Chestnut286 MW4.5 km
Solar Blue475 MW6 km
Aquamarine250 MW7.7 km
Kettleman Solar -Centaurus20 MW8.3 km
Almond20 MW10.1 km