← Back to map

Solar Blue

Kings County, California · EIA plant ID 63848 · Operator: Westlands Solar Blue
SolarBatteriesSolar PhotovoltaicCAISOBA: CISO
Nameplate475MWSummer 475 MW
Generators2in service
Net generation645GWh12 mo to Aug 2026
Capacity factor31%solar units, summer MW
Heat rate—thermal plants only
First online2023

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
020406080GWh202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%30%2023202420252026202731.1% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
202329.415.8%—
2024585.428.2%—
2025652.231.6%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
BESS1BatteriesBA225225Dec 2023Operating—coming soon
SBLUESolar PhotovoltaicPV250250Dec 2023Operating—coming soon

Owner / operator

Operator: Westlands Solar Blue. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Westlands Solar Blue100.0%475 MW

Nearby plants

Within 80 km.
Chestnut286 MW1.5 km
Aquamarine250 MW1.8 km
Grape—3.1 km
Almond20 MW4.3 km
Mustang Two150 MW4.8 km
Westside Solar Power PV12 MW5 km