Almond

Kings County, California · EIA plant ID 62546 · Operator: Westlands Almond LLC
SolarSolar PhotovoltaicCAISOBA: CISO
Nameplate20MWSummer 20 MW
Generators1in service
Net generation49GWh12 mo to Dec 2025
Capacity factor28%solar units, summer MW
Heat rate—thermal plants only
First online2023

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0246GWh202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%202320242025202628.2% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20239.616.4%—
202439.222.4%—
202549.228.2%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
ALMNDSolar PhotovoltaicPV19.919.9Sep 2023Operating—coming soon

Owner / operator

Operator: Westlands Almond LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Westlands Almond LLC100.0%20 MW

Nearby plants

Within 80 km.
Westside Solar Power PV12 MW0.8 km
RE Mustang LLC175 MW1.2 km
Mustang Two150 MW1.3 km
RE Kent South, LLC20 MW1.6 km
Henrietta D Energy Storage LLC10 MW1.9 km
Slate Hybrid440 MW2.1 km