← Back to map

RE Mustang LLC

Kings County, California · EIA plant ID 59150 · Operator: GSRP
SolarBatteriesSolar PhotovoltaicCAISOBA: CISO
Nameplate175MWSummer 175 MW
Generators2in service
Net generation221GWh12 mo to Dec 2025
Capacity factor27%solar units, summer MW
Heat rate—thermal plants only
First online2016

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0102030GWh201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%20%40%60%20162018202020222024202626.7% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2016211.757.6%—
2017264.830.2%—
2018259.129.6%—
2019247.228.2%—
2020231.326.3%—
202120423.6%—
2022202.824.9%—
2023149.918.5%—
2024220.626.7%—
2025220.826.7%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
BESS1BatteriesBA7575Oct 2021Operating—coming soon
PV1Solar PhotovoltaicPV100100Aug 2016Operating—coming soon

Owner / operator

Operator: GSRP. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
RE Mustang LLC100.0%175 MW

Nearby plants

Within 80 km.
Westside Solar Power PV12 MW0.5 km
RE Kent South, LLC20 MW0.5 km
Mustang Two150 MW0.8 km
Henrietta D Energy Storage LLC10 MW0.8 km
Slate Hybrid440 MW0.9 km
Almond20 MW1.2 km