SR Odom
Colquitt County, Georgia · EIA plant ID 63814 · Operator: Odom Solar, LLC
Nameplate20MWSummer 20 MW
Generators1in service
Net generation45GWh12 mo to Dec 2025
Capacity factor26%solar units, summer MW
Heat rate—thermal plants only
First online2020
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2020 | 5 | 17.2% | — |
| 2021 | 47.3 | 27.0% | — |
| 2022 | 50.7 | 28.9% | — |
| 2023 | 47.4 | 27.0% | — |
| 2024 | 44.7 | 25.5% | — |
| 2025 | 45.3 | 25.8% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| ODOM | Solar Photovoltaic | PV | 20 | 20 | Nov 2020 | Operating | — | coming soon |
Owner / operator
Operator: Odom Solar, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Odom Solar, LLC | 100.0% | 20 MW |
Nearby plants
Within 80 km.
| Quitman II Solar | 150 MW | 23.7 km |
| Quitman Solar | 150 MW | 25 km |
| Denver Braswell PV | 1 MW | 32.1 km |
| Valdosta Prison | 1 MW | 34 km |
| Pecan Row Landfill To Electric Facility | 6 MW | 36.1 km |
| Valdosta Water Treatment Plant | 3 MW | 37 km |