← Back to map

Quitman Solar

Brooks County, Georgia · EIA plant ID 62584 · Operator: Quitman Solar, LLC
SolarSolar PhotovoltaicBA: SOCO
Nameplate150MWSummer 150 MW
Generators1in service
Net generation345GWh12 mo to Aug 2026
Capacity factor26%solar units, summer MW
Heat rate—thermal plants only
First online2019

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
010203040GWh2020202120222023202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%20192020202120222023202420252026202726.2% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
201919.117.2%—
2020354.526.9%—
202133525.5%—
2022352.626.8%—
2023345.126.3%—
2024330.525.1%—
2025320.224.4%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
QUITMSolar PhotovoltaicPV150150Dec 2019Operating—coming soon

Owner / operator

Operator: Quitman Solar, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Quitman Solar, LLC100.0%150 MW

Nearby plants

Within 80 km.
Quitman II Solar150 MW1.7 km
SR Odom20 MW25 km
Pecan Row Landfill To Electric Facility6 MW27.1 km
Valdosta Prison1 MW33.2 km
South Georgia Medical Center6 MW33.8 km
PCA-Valdosta Mill70 MW36.8 km