← Back to map

Elora Solar

Lincoln County, Tennessee · EIA plant ID 63719 · Operator: Elora Solar
SolarSolar PhotovoltaicBA: TVA
Nameplate150MWSummer 150 MW
Generators1in service
Net generation338GWh12 mo to Aug 2026
Capacity factor26%solar units, summer MW
Heat rate—thermal plants only
First online2022

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
010203040GWh2023202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%20222023202420252026202725.7% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2022307.928.0%—
2023347.426.4%—
2024305.923.2%—
202531624.1%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
ELOSolar PhotovoltaicPV150150Mar 2022Operating—coming soon

Owner / operator

Operator: Elora Solar. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Elora Solar100.0%150 MW

Nearby plants

Within 80 km.
Tims Ford46 MW16.2 km
SR Tullahoma—33.9 km
TAI Huntsville Solar Hybrid32 MW36.8 km
Cumblerland Land Holdings, LLC15 MW49.6 km
Bellefonte14 MW54.2 km
Redstone Arsenal Hybrid11 MW55.7 km