TAI Huntsville Solar Hybrid

Madison County, Alabama · EIA plant ID 67488 · Operator: TAI Huntsville Solar, LLC
SolarSolar PhotovoltaicBA: TVA
Nameplate32MWSummer 32 MW
Generators1in service
Net generation66GWh12 mo to Aug 2026
Capacity factor23%solar units, summer MW
Heat rate—thermal plants only
First online2024

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0246GWh20252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%202420252026202723.1% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
202430.621.4%—
202562.422.0%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
PV1Solar PhotovoltaicPV32.432.4Jul 2024Operating—coming soon

Owner / operator

Operator: TAI Huntsville Solar, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
TAI Huntsville Solar, LLC100.0%32 MW

Nearby plants

Within 80 km.
Redstone Arsenal Hybrid11 MW24.4 km
Cumblerland Land Holdings, LLC15 MW25.5 km
Elora Solar150 MW36.8 km
Decatur Energy Center902 MW42.1 km
Morgan Energy Center900 MW44.9 km
Browns Ferry3,854 MW46.8 km