Rancho Seco Solar II, LLC

Sacramento County, California · EIA plant ID 63387 · Operator: Rancho Seco Solar II, LLC
SolarSolar PhotovoltaicBA: BANC
Nameplate160MWSummer 160 MW
Generators1in service
Net generation269GWh12 mo to Aug 2026
Capacity factor19%solar units, summer MW
Heat rate—thermal plants only
First online2021

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
010203040GWh202120222023202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%202120222023202420252026202719.2% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2021322.325.1%—
2022216.715.5%—
2023171.112.2%—
2024294.821.0%—
2025275.119.6%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
RSS2Solar PhotovoltaicPV160160Feb 2021Operating—coming soon

Owner / operator

Operator: Rancho Seco Solar II, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Rancho Seco Solar II, LLC100.0%160 MW

Nearby plants

Within 80 km.
Dry Creek Energy Storage, LLC—0.1 km
Rancho Seco Solar, LLC11 MW0.9 km
Cosumnes557 MW1 km
Sacramento Soleil LLC1 MW12.1 km
RE Dillard 4 LLC0 MW13.8 km
RE Dillard 3 LLC3 MW13.8 km