Rancho Seco Solar, LLC

Sacramento County, California · EIA plant ID 60226 · Operator: Rancho Seco Solar, LLC
SolarSolar PhotovoltaicBA: BANC
Nameplate11MWSummer 11 MW
Generators1in service
Net generation18GWh12 mo to Dec 2025
Capacity factor19%solar units, summer MW
Heat rate—thermal plants only
First online2016

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
012GWh201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%20162018202020222024202619.0% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20167.919.9%—
201723.725.0%—
201824.225.6%—
201922.724.0%—
202022.924.1%—
202122.323.6%—
202217.718.7%—
202313.314.0%—
202419.220.2%—
20251819.0%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
GEN01Solar PhotovoltaicPV10.810.8Aug 2016Operating—coming soon

Owner / operator

Operator: Rancho Seco Solar, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Rancho Seco Solar, LLC100.0%11 MW

Nearby plants

Within 80 km.
Cosumnes557 MW0.8 km
Rancho Seco Solar II, LLC160 MW0.9 km
Dry Creek Energy Storage, LLC—1 km
Sacramento Soleil LLC1 MW13 km
RE Dillard 4 LLC0 MW14.7 km
RE Dillard 3 LLC3 MW14.7 km