ATOOD Solar IV, LLC

Brunswick County, North Carolina · EIA plant ID 63383 · Operator: Alchemy Renewable Energy
SolarSolar PhotovoltaicBA: CPLE
Nameplate5MWSummer 5 MW
Generators1in service
Net generation6GWh12 mo to Dec 2025
Capacity factor15%solar units, summer MW
Heat rate—thermal plants only
First online2019

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0200400600800MWh202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%2019202020212022202320242025202614.5% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20190.24.9%—
20208.118.6%—
20218.318.9%—
20227.116.2%—
20237.517.1%—
20247.517.0%—
20256.414.5%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
NCATDSolar PhotovoltaicPV55Dec 2019Operating—coming soon

Owner / operator

Operator: Alchemy Renewable Energy. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Alchemy Renewable Energy100.0%5 MW

Nearby plants

Within 80 km.
AGA TAG Solar IV LLC5 MW0.4 km
L V Sutton Combined Cycle851 MW7 km
SunEdison LV Sutton Plant Site1 MW7.4 km
South Atlantic Services Solar Farm I2 MW8 km
Trojan Solar, LLC5 MW13.8 km
Delco Farm5 MW14.4 km