← Back to map

L V Sutton Combined Cycle

New Hanover County, North Carolina · EIA plant ID 58697 · Operator: Duke Energy Progress - (NC)
Natural gasNatural Gas Fired Combined CycleNatural Gas Fired Combustion Turbine⛽ Dual-fuelBA: CPLE
Nameplate851MWSummer 698 MW
Generators5in service
Net generation4,139GWh12 mo to Aug 2026
Capacity factor68%gas/coal/oil units, summer MW
Heat rate7,363Btu/kWhfossil units, electric fuel, HHV
First online2013Runs as baseload

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
-1000100200300400GWh2014201520162017201820192020202120222023202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%25%50%75%201420162018202020222024202667.7% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
6,8007,0007,2007,40020142016201820202022202420267,363 Btu/kWh · 12 mo
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2013468.451.4%6,877
20143,866.371.0%6,998
20154,372.680.3%7,028
20164,71988.5%7,034
20174,670.782.5%7,141
20183,643.560.7%7,515
20194,620.577.0%7,299
20204,078.467.2%7,238
20214,177.469.0%7,211
20223,927.364.2%7,175
20233,890.163.6%7,196
20244,000.865.3%7,125
20253,534.557.8%7,314

Fuel capability

Gas-fired turbines (CT/GT/CA/CS) that can also burn liquid fuel. EIA-860 Schedule 3 for capability, EIA-923 for actual burn.
StatusLikely still dual fuel
Liquid fuel burned · 36 mo15,288 MMBtu
Last month with liquid burnApr 2026
Switch while operatingYes
Net summer MW on gas685
Net summer MW on oil685
Time gas → oilunknown (EIA UNK)
Time oil → gasunknown (EIA UNK)

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
CA1Natural Gas Fired Combined CycleCA288268Nov 2013Operating—coming soon
CT004Natural Gas Fired Combustion TurbineGT60.542Jul 2017Operating—coming soon
CT005Natural Gas Fired Combustion TurbineGT60.542Jul 2017Operating—coming soon
CT1Natural Gas Fired Combined CycleCT221173Nov 2013Operating—coming soon
CT2Natural Gas Fired Combined CycleCT221173Nov 2013Operating—coming soon

Owner / operator

Operator: Duke Energy Progress - (NC). Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Duke Energy Progress - (NC)100.0%851 MW

Nearby plants

Within 80 km.
SunEdison LV Sutton Plant Site1 MW0.5 km
South Atlantic Services Solar Farm I2 MW1.2 km
ATOOD Solar IV, LLC5 MW7 km
AGA TAG Solar IV LLC5 MW7.3 km
Trojan Solar, LLC5 MW20.4 km
Delco Farm5 MW20.9 km