← Back to map

Sayreville Solar Project

Middlesex County, New Jersey · EIA plant ID 63185 · Operator: NJR Clean Energy Ventures Corporation
SolarSolar PhotovoltaicPJMBA: PJM
Nameplate3MWSummer 3 MW
Generators1in service
Net generation5GWh12 mo to Dec 2025
Capacity factor19%solar units, summer MW
Heat rate—thermal plants only
First online2019

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0200400600MWh202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%2019202020212022202320242025202619.2% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20191.213.5%—
20205.520.1%—
20214.115.3%—
20225.620.7%—
20235.420.0%—
20245.319.6%—
20255.219.2%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
SAYRESolar PhotovoltaicPV3.13.1Sep 2019Operating—coming soon

Owner / operator

Operator: NJR Clean Energy Ventures Corporation. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
NJR Clean Energy Ventures III Corporation100.0%3 MW

Nearby plants

Within 80 km.
Sayreville Cogeneration Facility430 MW0.7 km
Red Oak Power LLC821 MW1.6 km
Parlin Solar LLC1 MW2.2 km
South River BESS Phase 110 MW3.6 km
South River 210 MW3.6 km
Sabert Solar2 MW4.4 km