Rio Rancho Solar Energy Center

Bernalillo County, New Mexico · EIA plant ID 63184 · Operator: PNM Resources
SolarSolar PhotovoltaicBA: PNM
Nameplate10MWSummer 10 MW
Generators1in service
Net generation27GWh12 mo to Dec 2025
Capacity factor31%solar units, summer MW
Heat rate—thermal plants only
First online2019

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0123GWh202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%30%2019202020212022202320242025202631.4% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20191.318.1%—
202025.929.4%—
202127.731.6%—
202227.531.4%—
202325.629.2%—
202423.827.1%—
202527.531.4%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
RIRASolar PhotovoltaicPV1010Dec 2019Operating—coming soon

Owner / operator

Operator: PNM Resources. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
PNM Resources100.0%10 MW

Nearby plants

Within 80 km.
Sandia Energy Center60 MW6.7 km
Eubank Landfill Solar Array2 MW7.5 km
RC Energy AA LLC Solar Facility1 MW8 km
Albuquerque Solar Energy Center2 MW12.9 km
Reeves154 MW13.1 km
Ford Utilities Center15 MW13.2 km