← Back to map

Albuquerque Solar Energy Center

Bernalillo County, New Mexico · EIA plant ID 57567 · Operator: PNM Resources
SolarSolar PhotovoltaicBA: PNM
Nameplate2MWSummer 2 MW
Generators1in service
Net generation4GWh12 mo to Dec 2025
Capacity factor23%solar units, summer MW
Heat rate—thermal plants only
First online2011

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0200400600MWh201120122013201420152016201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%2012201420162018202020222024202623.3% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20113.425.6%—
201200.0%—
20133.721.2%—
20144.525.4%—
20154.223.9%—
20164.424.9%—
20174.324.6%—
20184.324.4%—
20194.223.8%—
20203.821.6%—
20213.721.4%—
20224.224.0%—
2023422.7%—
20244.123.2%—
20254.123.3%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
ASEC1Solar PhotovoltaicPV22Apr 2011Operating—coming soon

Owner / operator

Operator: PNM Resources. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Public Service Co of NM100.0%2 MW

Nearby plants

Within 80 km.
Reeves154 MW0.3 km
RC Energy AA LLC Solar Facility1 MW5.1 km
Ford Utilities Center15 MW9.7 km
Rio Rancho High School1 MW12.3 km
Oso Negro—12.7 km