Eubank Landfill Solar Array
Bernalillo County, New Mexico · EIA plant ID 59393 · Operator: Suncore Photovoltaics, Inc
Nameplate2MWSummer 2 MW
Generators1in service
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online2013
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2014 | 3.9 | 22.0% | — |
| 2015 | 3.8 | 21.6% | — |
| 2016 | 3.7 | 21.3% | — |
| 2017 | 2.9 | 16.4% | — |
| 2018 | 2.5 | 14.4% | — |
| 2019 | 3.3 | 18.8% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| ESNM1 | Solar Photovoltaic | PV | 2 | 2 | Nov 2013 | Operating | — | coming soon |
Owner / operator
Operator: Suncore Photovoltaics, Inc. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Emcore Solar New Mexico, LLC | 100.0% | 2 MW |
Nearby plants
Within 80 km.
| Sandia Energy Center | 60 MW | 0.9 km |
| Rio Rancho Solar Energy Center | 10 MW | 7.5 km |
| Netflix ABQ System B | 2 MW | 9.3 km |
| Netflix ABQ System A | 3 MW | 9.3 km |
| Ford Utilities Center | 15 MW | 9.5 km |
| Rio Bravo | 150 MW | 10.7 km |