Fort Valley State University Solar

Peach County, Georgia · EIA plant ID 63062 · Operator: Georgia Power Co
SolarSolar PhotovoltaicBA: SOCO
Nameplate11MWSummer 11 MW
Generators1in service
Net generation21GWh12 mo to Dec 2025
Capacity factor22%solar units, summer MW
Heat rate—thermal plants only
First online2022

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
00.511.52GWh2022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%2022202320242025202621.9% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
202221.923.1%—
202320.621.8%—
202421.222.3%—
202520.721.9%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1Solar PhotovoltaicPV10.810.8Jan 2022Operating—coming soon

Owner / operator

Operator: Georgia Power Co. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Georgia Power Co100.0%11 MW

Nearby plants

Within 80 km.
SR Perry68 MW16.3 km
Mid-Georgia Cogeneration Facility323 MW26.3 km
Brenneman Solar Project—26.6 km
Robins184 MW29.5 km
Robins Air Force Base Solar256 MW32 km
CG PS Portfolio 1, LLC2 MW32.2 km