Nameplate68MWSummer 68 MW
Generators1in service
Net generation154GWh12 mo to Aug 2026
Capacity factor26%solar units, summer MW
Heat rate—thermal plants only
First online2021
The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2021 | 6.7 | 13.3% | — |
| 2022 | 168.8 | 28.3% | — |
| 2023 | 157 | 26.4% | — |
| 2024 | 149.8 | 25.1% | — |
| 2025 | 157.1 | 26.4% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| PERRY | Solar Photovoltaic | PV | 68 | 68 | Dec 2021 | Operating | — | coming soon |
Owner / operator
Operator: SR Perry, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| SR Perry, LLC | 100.0% | 68 MW |
Nearby plants
Within 80 km.
| Fort Valley State University Solar | 11 MW | 16.3 km |
| Mid-Georgia Cogeneration Facility | 323 MW | 17.9 km |
| CG PS Portfolio 1, LLC | 2 MW | 18.9 km |
| Brenneman Solar Project | — | 24.9 km |
| Robins | 184 MW | 26.5 km |
| Flint River Operations | 77 MW | 32.6 km |