← Back to map

SR Perry

Houston County, Georgia · EIA plant ID 64151 · Operator: SR Perry, LLC
SolarSolar PhotovoltaicBA: SOCO
Nameplate68MWSummer 68 MW
Generators1in service
Net generation154GWh12 mo to Aug 2026
Capacity factor26%solar units, summer MW
Heat rate—thermal plants only
First online2021

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
051015GWh20222023202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%30%202120222023202420252026202725.8% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20216.713.3%—
2022168.828.3%—
202315726.4%—
2024149.825.1%—
2025157.126.4%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
PERRYSolar PhotovoltaicPV6868Dec 2021Operating—coming soon

Owner / operator

Operator: SR Perry, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
SR Perry, LLC100.0%68 MW

Nearby plants

Within 80 km.
Fort Valley State University Solar11 MW16.3 km
Mid-Georgia Cogeneration Facility323 MW17.9 km
CG PS Portfolio 1, LLC2 MW18.9 km
Brenneman Solar Project—24.9 km
Robins184 MW26.5 km
Flint River Operations77 MW32.6 km