Hill Top Energy Center, LLC

Greene County, Pennsylvania · EIA plant ID 62565 · Operator: Hill Top Energy Center, LLC
Natural gasNatural Gas Fired Combined CyclePJMBA: PJM
Nameplate665MWSummer 624 MW
Generators1in service
Net generation4,146GWh12 mo to Aug 2026
Capacity factor76%gas/coal/oil units, summer MW
Heat rate6,686Btu/kWhfossil units, electric fuel, HHV
First online2021Runs as baseload

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0100200300400GWh20222023202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%25%50%75%202120222023202420252026202775.9% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
6,5506,6006,6506,70020212022202320242025202620276,686 Btu/kWh · 12 mo
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20211,891.969.0%6,576
20224,142.576.1%6,596
20233,945.672.4%6,703
20245,091.393.3%6,656
20254,258.878.0%6,687

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
GEN1Natural Gas Fired Combined CycleCS664.7623.5Jul 2021Operating—coming soon

Owner / operator

Operator: Hill Top Energy Center, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Hill Top Energy Center, LLC100.0%665 MW

Nearby plants

Within 80 km.
Fayette Energy Facility715 MW4.3 km
Grays Landing L&D Hydroelectric Project—7.9 km
Maxwell L&D Hydroelectric Project—12.2 km
Gans Solar14 MW18.3 km
Gans88 MW18.4 km
Point Marion L&D Hydroelectric Project—18.8 km